Total
length of Khangiran / Mashhad gas pipeline:138 km.;36"; thickness: 0.406,0.500,and
0.625 , and 0.750 inches. The foreseen installations of the entire pipeline
include: one tubing transmitter station and automatic valve at the begining of
the line, 5 stations of automatic valves on kilometers on 25+603,51,68+405,92+107,115+070,4
cathodic production stations on kilometers 10+900,64+100,106+600, 138+122 and
dislocating 4 rust proofing stations existing on the trajectory of new pipeline
, and one tubing catchet station and automatic valve on kilometer 138+122.
Likewise 9 crossings on asphalt road and 5 crossings on mud road and graveled
causeway, and 4 cases of creating water indicators,14 cases of crossing with waterway,43
cases of crossings with culvert exist on the trajectory of pipeline.