execution operations of the above gas pipeline have been completed in two phase : trajectory , digging , welding , pipe laying , hydrostatic test and installation of launcher , receiver and in-way valves , on 26/10/2001 the pipeline was injected with gas and is being utilized at present with the grace of almighty God .